loader

Supply Chain Management (SCM)

Average Lead Time

4.2 Days

-0.5 days from last month
Freight Cost Efficiency

94%

Route optimization active
VMI Health Score

A+

Supplier inventory levels stable
Monitoring material levels directly at Supplier's warehouse to trigger automatic replenishment.
Supplier Material Supplier Stock Safe Level Status Action
PT. Steel Jaya Plat Besi 2x1m 1,200 Pcs 500 Pcs Optimal
Hardware King Baut 10mm 250 Pcs 1,000 Pcs Critical at Supplier
Live Shipment Tracking
INBOUND (Purchase Order)
PO-2024-005 (Plat Besi)

Fleet: B 1234 XY (Hino Ranger)

In Transit
ETA: 2h 15m
OUTBOUND (Sales Order)
SO-2024-002 (Custom Gaming PC)

Fleet: L 9920 ZZ (Blind Van)

Loading
Ready for dispatch
Top Bottlenecks
  • Customs Clearance (Inbound) +2.5 Days
  • QC Inspection (WMS) +0.5 Days
  • Picking/Packing (WMS) Optimal

Settings

Theme