loader

Manufacturing Resource Planning (MRP)

Active

12

Work Orders in Process

Load: 82%

IDR 2.4B

Work in Progress Value

Critical

2

Machines Down (Downtime)

Production Performance (OEE)
Work Center Live Monitor
CNC Milling A
Active
85%
Efficiency
CNC Milling B
Setup
20%
Efficiency
Laser Cutting
Down
0%
Efficiency
Assembly Line 1
Active
95%
Efficiency
Assembly Line 2
Maintenance
0%
Efficiency
Product / Assembly Revision Components Last Costing Status Actions
Engine Block X1
FG-ENG-001
v2.4 (Active) 24 Items IDR 12.5M Approved
WO # Product Progress Release Date Priority Actions
WO-2024-882 Engine Block X1 (50 Units)
65%
May 02, 2026 High
Live Route: CNC Milling A
Shift 1
WO-2024-882

Step 2: Surface Grinding


42

OK Units

3

Reject

5

Pending
Ready to Scan

Scan Barcode / QR to start operation

Machine Issue Type Reported By Status Cost Est. Actions
Laser Cutting Power Supply Failure Andi (Operator) Critical IDR 15.000.000
Assembly Line 2 Scheduled Maintenance System Routine IDR 2.500.000

Settings

Theme